Bambrick, B (1994) Construction of an Island. Journal of Construction Engineering and Management, 120(01), 223–7.

  • Type: Journal Article
  • Keywords: Land reclamation; Japan; Islands; Construction methods; Airport construction; Sea floor; Soil consolidation;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1994)120:1(223)
  • Abstract:
    In January of 1987 work began on one of the most challenging construction projects in recent time. The Kansai International Airport Co. is responsible for reclaiming 1,263 acres (511 ha) of land in Osaka Bay. The resulting man‐made island will be the foundation for Japan's first 24‐hr airport. This paper focuses on the various stages involved in the reclamation process. To accommodate the settlement that accompanies most reclamation work, the consolidation of the seafloor was accelerated using three methods: sand drains, sand compaction piles, and deep cement‐mixing. The seafloor improvement also enhances the stability of the island's seawall, which surrounds it entirely. The construction of this seawall is presented. Furthermore, an enormous amount of fill was used to reclaim the land that now forms the island, and the procedure for placing this fill is described. Also, some of the problems encountered during the construction phase of the project are explored.

Gordon, C M (1994) Choosing Appropriate Construction Contracting Method. Journal of Construction Engineering and Management, 120(01), 196–210.

Grimm, C T (1994) Void Mortar Joints: Bane of Brick Masonry. Journal of Construction Engineering and Management, 120(01), 152–61.

Halligan, D W, Demsetz, L A, Brown, J D and Pace, C B (1994) Action‐Response Model and Loss of Productivity in Construction. Journal of Construction Engineering and Management, 120(01), 47–64.

Ledbetter, W B (1994) Quality Performance on Successful Project. Journal of Construction Engineering and Management, 120(01), 34–46.

Oloufa, A A, Eltahan, A A and Papacostas, C S (1994) Integrated GIS for Construction Site Investigation. Journal of Construction Engineering and Management, 120(01), 211–22.

Riad, N I, Arditi, D and Mohammadi, J (1994) Integrated System for Managing Owner‐Directed Project Acceleration. Journal of Construction Engineering and Management, 120(01), 77–95.

Russell, A D and Fayek, A (1994) Automated Corrective Action Selection Assistant. Journal of Construction Engineering and Management, 120(01), 11–33.

Russell, J S, Gugel, J G and Radtke, M W (1994) Comparative Analysis of Three Constructability Approaches. Journal of Construction Engineering and Management, 120(01), 180–95.

Rwelamila, P D (1994) Group Dynamics and Construction Project Manager. Journal of Construction Engineering and Management, 120(01), 3–10.

Tanwani, R and Iseley, D T (1994) Tracking and Steering Systems in Trenchless Construction. Journal of Construction Engineering and Management, 120(01), 65–76.

Teicholz, P and Fischer, M (1994) Strategy for Computer Integrated Construction Technology. Journal of Construction Engineering and Management, 120(01), 117–31.

Thabet, W Y and Beliveau, Y J (1994) Modeling Work Space to Schedule Repetitive Floors in Multistory Buildings. Journal of Construction Engineering and Management, 120(01), 96–116.

Thomas, H R and Sakarcan, A S (1994) Forecasting Labor Productivity Using Factor Model. Journal of Construction Engineering and Management, 120(01), 228–39.

Warszawski, A and Rosenfeld, Y (1994) Robot for Interior‐Finishing Works in Building: Feasibility Analysis. Journal of Construction Engineering and Management, 120(01), 132–51.

Wu, R W and Hadipriono, F C (1994) Fuzzy Modus Ponens Deduction Technique for Construction Scheduling. Journal of Construction Engineering and Management, 120(01), 162–79.